ZINC BATH DIMENSIONS

15,4

Length in meters

1,65

Width in meters

3,2

Height in meters

Bridge crane lifting capacity

12.6 tonnes (10 bridge cranes)

Forklift handling capacity

7 tonnes (15 forklifts)

Destination departments

28 – 35 – 37 – 41 – 44 – 49 – 53 – 72 – 79 – 85 – 86
Other departments and on-site delivery upon request

ORGANISATION

Dylan RICHET
Director

Geoffroy BARBIER-THALY
Quality, security and environment Director

Bruno LOURENCO
Production & Planning Director

Guillaume MANCEAU
Administrative and financial Director

Aline GERNIGON
Technical sales

Céline ROBERT
Logistics and Transport Manager

ZI d’Écouflant – Boulevard de l’Industrie – F-49000 Angers – +33 (0)2 41 31 14 14

Monday to Thursday: 6 am / 10 pm. Friday: 6 am / 4 pm

1 + 0 = ?

ZINC BATH DIMENSIONS

14,4

Length in meters

2,7

Width in meters

2,9

Height in meters

Bridge crane lifting capacity

12,6 tonnes

Forklift handling capacity

16 tonnes

Destination departments

16 – 17 – 24 – 33 – 79 – 85 – 86
Other departments and on-site delivery upon request

ORGANISATION

Philippe LANOË

Director

Laurent ALBERT

Technical-commercial manager

Dimitri JOUFFREAU

Planning manager

Maxime GUIOCHET

Logistics manager

Rémi BOURION

Craftsmen and Individuals department manager

ZI de Chef de Baie – 51 rue du Québec – F-17000 La Rochelle – +33 (0)5 46 42 64 61

Monday to Thursday: 8 am / 12 pm – 2 pm / 6 pm. Friday: 8 am / 12 pm – 2 pm / 4 pm

3 + 1 = ?

ZINC BATH DIMENSIONS

8,4

Length in meters

1,55

Width in meters

3

Height in meters

Bridge crane lifting capacity

6.4 tonnes (12 bridge cranes)

Forklift handling capacity

5 tonnes (15 forklifts)

Destination departments

37 – 41 – 49 – 79 – 85 – 86 – 87
Other departments and on-site delivery upon request

ORGANISATION

Nicolas SERVAIN

Director

Manuella RIOU-LEBREC

Technical-commercial Director

Raphaël GUIGNARD

Logistics and quality

Amanda SOURDEAU

Accounting Director

Stéphane DJEHA

Production and planning Director

ZI Nord – 4 rue des Forges – F-86200 Loudun – +33 (0)5 49 22 30 94

Monday to Thursday: 7 am / 6 pm. Friday: 7 am / 12 pm

3 + 0 = ?

ZINC BATH DIMENSIONS

6,4

Length in meters

1,3

Width in meters

3

Height in meters

Bridge crane lifting capacity

3.2 tonnes (7 bridge cranes)

Forklift handling capacity

6 tonnes (10 forklifts)

Destination departments

14 – 28 – 35 – 53 – 61 – 72
Other departments and on-site delivery upon request

ORGANISATION

Christophe CRUZ

Director

Christelle CRUZ

Logistics and production secretary

Dominique CRUZ

Production, planning and quality Director

Manon LOCHIN

Receiving and Shipping Department

Annick SOCHON

Accounting Director

Route de la Boorie – BP 10 – F-53700 Villaines-la-Juhel – +33 (0)2 43 30 46 66

Open Monday to Friday: 5 am / 7 pm (teams finish at 8 pm)

5 + 1 = ?

ZINC BATH DIMENSIONS

3,4

Length in meters

1

Width in meters

2,5

Height in meters

Bridge crane lifting capacity

3.2 tonnes (3 bridge cranes)

Forklift handling capacity

4 tonnes (3 forklifts)

Destination departments

37 – 41 – 49 – 72 – 85

Other departments and on-site delivery upon request

ORGANISATION

Moïse PAPIN

Director

Eugène LEDEIST

Production, planning and logistics Director

Véronique BOIGARD

Accounting Director

15 rue du Moulin de Grolleau – F-49490 Noyant – +33 (0)2 41 82 68 44

Open Monday to Thursday: 7 am / 6 pm. Friday: 7 am / 16 pm

4 + 3 = ?

Production lead times

A high-performance scheduling department.

Parts are designed as per the NF EN ISO 14713-2 standard, to ensure the best possible processing lead times.

Design, traceability and quality

Support provided in designing your equipment as per the NF EN ISO 14713-2 standard, to ensure the best possible processing lead times.

Thickness compliance and verification certificate.

Order quality and traceability insurance plan.

Anti-corrosion warranty of up to 12 years, in line with the customer’s specifications.

Specific features

Covered storage and loading surfaces.

Appointments are possible day and night upon request (on-site accommodation).

Completion prior to painting. Packing list or specific finish services.

Loading of “traditional” containers for Export.

Additional services provided by local partners: sandblasting, metal plating and painting.

Double tempering

Technical and quality feasibility assessment.